Railways Engineering Online Test – Multiple Choice Questions & Answers

1. Indian Railways detects the rail flow by

 
 
 
 

2. If sleeper density is M + 7 for 13 m rails, the minimum depth of ballast under wooden sleepers (25 cm x 13 cm), is

 
 
 
 

3. Minimum composite sleeper index for wooden sleepers used in cross-overs, is

 
 
 
 

4. The spike commonly used to fix rails to wooden sleepers in Indian railways, is

 
 
 
 

5. A mono-block sleeper has

 
 
 
 

6. Composite sleeper index determines

 
 
 
 

7. Heel of crossing is the line joining

 
 
 
 

8. In Indian railways, plate laying is usually done by

 
 
 
 

9. On Indian Railways standard length of rails for B.G. track, is

 
 
 
 

10. The place where a railway line and a road cross each other at the same level, is known as

 
 
 
 

Question 1 of 10