Waste Water Engineering Online Test – Multiple Choice Questions and Answers

1. For providing an Indian type W.C., the R.C.C. slabs in the toilet portion

 
 
 
 

2. The detention period for plain sedimentation water tanks, is usually

 
 
 
 

3. The standard B.O.D. of water is taken for

 
 
 
 

4. If the depletion of oxygen is found to be 2.5 mg/litre after incubating 2.5 ml of sewage diluted to 250 ml for 5 days at 20°C, B.O.D. of the sewage is

 
 
 
 

5. A drop manhole is provided if

 
 
 
 

6. To prevent settling down of sewage both at the bottom and on the sides of a large sewer, self-cleaning velocity recommended for Indian conditions, is

 
 
 
 

7. Rate of flow of sewage is generally assumed

 
 
 
 

8. A manhole is classified as shallow if its depth is between

 
 
 
 

9. The digested sludge from septic tanks, is removed after a maximum period of

 
 
 
 

10. The amount of oxygen consumed by the aerobic bacterias which cause the aerobic biological decomposition of sewage, is known

 
 
 
 

Question 1 of 10

6 thoughts on “Waste Water Engineering Online Test – Multiple Choice Questions and Answers

Leave a Reply to manish koushis Cancel reply

Your email address will not be published. Required fields are marked *