300+ Data Center Management FAQs and Answers [Experienced / Freshers]

Data Center Management Interview Questions with Answers

Question: 1. What Are Data Center Cages And Cabinets?

Answer:

Cages and shelves delineate the sort of space that a colocation company will deliver to a patron in a retail colocation model. Cages are moveable walls on top of raised floors to split one patron’s space from that of some other. Cabinets, then again, are usually lockable character racks to house server, storage or communications gadget. Cages are typically for larger retail colocation clients, at the same time as shelves can are available 1/three, half or complete sizes. Both are utilized in shared room environments (other clients).

Question: 2. What Is A Carrier-neutral Data Center?

Answer:

A records center is stated to be carrier-neutral if a client can order move connections or communications services from any existing company and the information middle provider actively attempts to court additional providers into the facility.

Project Management Interview Questions
Question: three. What Is Data Center Containment?

Answer:

For years, IT managers have deployed their servers and IT equipment in warm and bloodless aisles. In this type of situation, the the front side of two rows of equipment racks face each other and draw cool air into each rack’s gadget intake. As such, the lower back side of  rows each expel hot air into the new aisle. While this is an green concept, it could no longer cross far enough for higher energy loads. A technique to make the records middle even more green is to deploy both warm or bloodless aisle containment. In bloodless aisle containment, the bloodless aisles are augmented to effectively “entice” cold air into the cold aisle. This allows the statistics center operator to growth air managing set factors and more effectively cool the intakes of the servers. On the opposite hand, warm aisle containment is a approach to isolate the new air exhaust located in the warm aisle. In both instances, the intent is to limit blending of extensively specific air temperatures. Both solutions may be effective to lower PUE.

Question: 4. What Does Critical Power Mean?

Answer:

“Critical” strength or “IT load” frequently refers back to the facts middle load this is ate up or is devoted to IT gadget consisting of servers, garage equipment and communications switches and routers. Power for lighting or cooling the facts center is excluded from “crucial” power. It’s crucial for an stop user to apprehend their crucial load as the statistics center – whether or not managed internally or outsourced – could be sized based on the cutting-edge or expected amount of important energy.

Project Management Tutorial
Question: 5. What Is A Cross-connection Or Data Center Cross Connect?

Answer:

A move connection is most usually a layer 1 or bodily layer connection between  networks. Data middle carriers usually section go connections by sort of cabling used to make the connection – copper, coaxial or fiber. Cross connections are typically finished by way of the records center issuer for a non-ordinary (NRC) and a monthly ordinary (MRC) price.

Network Security Interview Questions
Question: 6. What Is Dcim, And Why Would I Need It? 

Answer:

DCIM (statistics center infrastructure control) is a mixture of software program, hardware and sensors that permits you to reveal, optimize and intelligently plan electricity and cooling potential for your facts center. DCIM gear have emerge as crucial as the availability and working costs of the records center have grow to be more and more intertwined with the power. 

Question: 7. What Are The Primary Types Of Dcim Software, And What Do They Do?

Answer:

There are  major categories of statistics center management software equipment:  monitoring/automation software program and planning/implementation software program. 

The first deals with tracking and automation of the IT room and facility power, environmental manipulate, and protection. It acts upon person-set thresholds by using alarming, logging, or even controlling bodily gadgets, and does things like verifying the records middle is functioning as designed, and automating activities that optimize availability and performance. 

The 2d category of software program focuses on making plans and implementation, where IT managers can typically have the finest effect on total price of ownership (TCO). It guarantees green deployment of latest gadget, organizes planning a good way to facilitate adjustments inside the facts center, tracks property, and simulates the impact of all forms of what-if” scenarios. 

Network Security Tutorial Cisco Interview Questions
Question: 8. Practically Speaking, What Do These Two Types Of Dcim Software Do?

Answer:

 Monitoring and automation software can do things like: 

Provide energy use details that allow the linking of running expenses to every business unit consumer organization, which then ll ws for” price backs” 
Monitor and control facility warmth, air flow, and aircon (HVAC) systems, as well as fire, water steam, and gas systems, and facility security 
Perform car discovery of latest device additions, verifying that the entirety works out of the box 
Report real-time, average and peak strength utilization by using rack, which would possibly help you decide in which to add a new server or identification and cast off habitual and viable dangerous load spikes 
Measure strength utilization effectiveness (PUE) on a daily foundation and track ancient PUE, supporting you examine whether fee slicing and strength saving techniques are truely running. 
Planning and implementation software program can do such things as: 

Generate stock reviews prepared via device type, age, manufacturer, and homes of the device (accessible to quick perceive underutilized belongings, property out of guarantee, and property that want to be upgraded) 
Generate an audit trail for adjustments to assets and paintings orders, together with a record of alarms raised and alarms removed, offering factual evidence for publish-failure analysis Perform vehicle discovery of latest system additions, verifying that the entirety works out of the field 
Map out what-il scenanos, along with: ill trade the contents of this rack, how will it impact my cooling? Measure strength utilization effectiveness (PUE) on a each day basis and song historic PUE, helping you analyze whether or not price slicing and energy saving techniques are truly running. 
Answer questions such as: 
What is my statistics center’s PUE? 
What is the choicest vicinity to put my next bodily or digital server? 
What will the effect of recent system be on my redundancy and safety margins?
Question: nine. Is Dcim Just About Software?

Answer:

No, DCIM equipment consist of a group of software programs (outlined above), records collection equipment, and a dashboard. The facts collection is generally achieved by means of gadgets like meters, power safety gadgets, embedded playing cards, programmable common sense controllers (PLCs), and sensors, which gather facts and ahead it to management software for processing. 

The other element of DCIM is a dashboard. Critical information from the DCIM software and records series equipment wishes to be aggregated and supplied so IT managers can visualize the information in a manner that is significant and actionable. Dashboards can be configured for distinctive desires, as an instance to consciousness at the overall performance of the IT equipment versus the physical infrastructure (cooling, strength, safety). 

PRINCE Interview Questions
Question: 10. How Do Older Generations Of Infrastructure Management Tools Differ From More Recent Versions?

Answer:

Eay bodily infrastructure control tools were constrained in scope and required considerable human intervention. While they might warn that a selected parameter were passed, the operator could must decide what gadget changed into tormented by the error. First-gen tools couldn’t make correlations between a physical infrastructure tool and a server, nor have been they capable of initiating actions to prevent downtime, which include dashing up enthusiasts to expend a hot spot. 

Never management tools are designed to discover and resolve troubles with minimal human intervention. By correlating electricity, cooling and space resources to individual servers (bodily and virtual), DCIM tools nowadays can proactively tell IT control systems of capability bodily infrastructure problems and how they may impact particular IT loads. Newer making plans software program tools illustrate, via a graphical user interface, the contemporary physical country of the information center and simulate the impact of destiny physical equipment provides, actions, and screw ups. 

Information Security Cyber Law Tutorial
Question: eleven. What Are Some Common Scenarios That Dcim Tools Can Help Avoid?

Answer:

Here are a few we see greater frequently than we’d like: 

A rack of servers loses electricity while an IT administrator by accident overloads an already maxed-out power strip. 
A large facts middle virtualizes and consolidates its maximum important packages on a cluster of servers. Using the failover mechanism of the virtualization platform, they experience blanketed from hardware failure. Unfortunately, of their panning, they don’t understand that every of the servers is depending on the equal UPS, because of this that if the usfails, no UPS-covered servers are available emigrate the affected hundreds to. 
An operator is making an attempt to decide whether energy capability that became just exceeded on a rack is handiest an anomaly or a developing trend. She is going on “gut sense” and leaves it on my own. The next time power ability in that rack is surpassed, a breaker trips and all of the servers downstream of that breaker that are jogging project vital applications are  close down. 
In a huge. Challenge important data center, the provisioning and set up of servers is so complicated that most effective tremendously paid settlement engineers are able to perform the undertaking. 
Cisco Network Engineer Interview Questions
Question: 12. How Does A High-density Or Highly Vitalized Environment Affect The Need For Management?

Answer:

With a couple of virtual machines and packages walking on any unmarried host, the fitness and availability of every bodily system becomes that much more crucial, and that’s where DCIM gear play a vital function in making sure ok power and cooling. The different attention is the intensive and constantly changing strength and cooling requirements of a virtual surroundings — dynamics masses in reality can’t be spoke back to manually. 

Project Management Interview Questions
Question: thirteen. What Can Dcim Tools Do To Help Manage Energy Consumption In M Data Center?

Answer:

Newer DCIM gear measure, monitor, automate, and optimize approaches for power performance. They can do things like: 

Initiate load shifts: for instance, while a tracking gadget detects a reduced information middle load at night time, it’d consolidate applications onto rack #1 and flip off rack #2, saving electricity. In addition, if the reduced IT load can perform at a better temperature, variable pace fanatics in CRAGS may be adjusted down, and the reduced cooling load might be pronounced to the building management device (BMS), which optimizes the chiller by elevating the chilled water temperature, saving extra energy. 
Maximize use of existing potential: DCIM gear help perceive excess capacity and pinpoint devices which can either be decommissioned or used some place else, saving on energy, capital, renovation, and manpower fees. DCIM tools also assist identification stranded capacity, or unusable ability as a result of an imbalance in energy, cooling, and/or rack space. Map out what-if scenarios, along with: if I exchange the contents of this rack, how will it effect my cooling? Measure strength utilization effectiveness (PUE) on a each day foundation and music historical PUE. Supporting you analyze whether or not price cutting and strength saving strategies are certainly working. 
Measure energy utilization effectiveness (PUE): DCIM gear song every day and historical PUE, helping you examine whether or not fee cutting and strength saving strategies are truely working and make adjustments as a result 
Question: 14. How Do I Evaluate Dcim Solutions?

Answer:

There are many DCIM equipment and suites of solutions on the market, and as with any acquisition, you want to look at each severely and select the one that pleasant meets your specific needs.

Question: 15. What Features/functions Do I Look For?

Answer:

Some features/functions to recall: 

Open source — supplier-neutrality is key, as very few statistics centers are standardized on a single seller from top to backside. Open supply DCIM software can combine records from, for instance, uninterruptible strength supply (UPS) systems, strength distribution gadgets (PDUs), and cooling devices from three (or greater) exceptional vendors. 

In addition, with open protocols, it’s miles pretty smooth to feature additional software equipment and assume them to communicate and work together correctly. 

Functionality — depending on your needs, you’ll need to explore diverse functions: 
Planning features, such as asset control and reason/effect analysis 
Operational features, along with supporting to finish greater tasks in less time, reducing human error, and figuring out root reasons of issues 
Analysis features, together with figuring out operational strengths and weaknesses and optimizing power utilization 
Civil Service Interview Questions
Question: 16. Explain Types Of Dcim Software, And What Do They Do?

Answer:

User interfaces — exceptional programs offer one-of-a-kind views, so pick out the ones that would be maximum beneficial to you. Among those normally to be had: 

Floor layout: offers an correct illustration of your statistics center in a ground plan and/or elevation diagram 
Recommended movements: Provides decriptions of problems and encouraged moves 
Virtual store room: Keeps track of new devices from arrival on web page through set up 
Rack the front view: Provides accurate graphical illustration of system and its location in the rack 
Equipment browser: Locates system based on seller call, model and/or type, and can frequently export gadget records to Excel format 
User rights management: Allows assignment of man or woman person rights and controls across rooms, places, reviews, alarms, and paintings orders 
Mobile devices: Communicates critical data to specific PDAS 
Question: 17. What Does Data Center Architecture Mean?

Answer:

Data middle architecture is the physical and logical layout of the sources and gadget within a facts center facility. 

It serves as a blueprint for designing and deploying a facts middle facility. It is a layered procedure which gives architectural pointers in information center improvement.

Data Center Technician Interview Questions
Question: 18. What Does Data Center Management Mean?

Answer:

Data center control refers to a small wide variety of employees who have been detailed and hired to manipulate big information sets and hardware systems that are normally a part of a big dispensed network. The facts center is liable for the management of large amounts of records and the hardware required to store it and distribute it to users.

Data middle control performs a vital position in protecting facts and maintaining it relaxed as a way to avoid information security breaches. The hosted laptop environment inside a facts middle should be explicitly managed, but most of the control is performed in an automatic style, thus saving hiring and power expenses. Data centers may be controlled remotely and won’t even residence real employees.

Functions of records middle control include upgrading hardware and software/working structures, coping with facts distribution and storage, backup regimes, emergency planning and some technical guide.

Network Security Interview Questions
Question: 19. Explain Multi-tier Model?

Answer:

The multi-tier records middle model is ruled with the aid of HTTP-based totally packages in a multi-tier approach. The multi-tier method consists of net, application, and database ranges of servers. Today, most web-based totally packages are constructed as multi-tier applications. The multi-tier version makes use of software that runs as separate procedures at the equal machine the usage of interprocess verbal exchange (IPC), or on distinctive machines with communications over the community. Typically, the following 3 stages are used:

Web-server
Application
Database
Multi-tier server farms built with techniques running on separate machines can offer progressed resiliency and protection. Resiliency is progressed because a server may be taken out of service even as the same characteristic remains furnished by means of another server belonging to the equal utility tier. Security is improved because an attacker can compromise an internet server without gaining access to the utility or database servers. Web and alertness servers can coexist on a common bodily server; the database typically stays separate.

Question: 20. What Is Data Center?

Answer:

A records middle (or datacenter) is a facility composed of networked computers and garage that organizations or other groups use to arrange, technique, store and disseminate large quantities of records. A commercial enterprise commonly is predicated heavily upon the applications, offerings and records contained within a statistics middle, making it a focal point and critical asset for normal operations.