250+ TOP MCQs on Distresses in Flexible Pavements and Maintenance Measures – 2 and Answers

Highway Engineering Question Bank on “Distresses in Flexible Pavements and Maintenance Measures – 2”.

It is also used as a weight loss drug in conjunction with other drugs to help maintain weight loss without the side effects of other. The tablets contain the same ingredients as viagra brand https://criticalfutureglobal.com/terms-of-use buy ivermectin 3 mg aide® to quickly increase potency as well as to prolong effect. Tamoxifen is prescribed to treat women with stage ii and stage iii breast cancer, as well as to reduce the risk of recurrence after surgery for breast cancer or after radiation treatment to treat certain cancers of the skin or head.

If you want to know how keto ultra pills work, you can look for the reasons why some of keto supplements work and some don’t. You are currently buy stromectol scabies online looking for the following: dapoxetine. Cuál es la manera más sencilla de encontrar esta opción para comprar unos antibióticos que seguro han de ahorrar tiempo?

1. The measure not adopted in reconstruction of new highway is _____________
a) Providing effective drainage system
b) Designing as per traffic
c) Use of inferior quality material
d) Use of modern machinery

Answer: c
Clarification: The measure not adopted is the use of inferior material, superior quality materials should be used.

2. Common types of unsurfaced roads adopted in India are ___________
a) Gravel roads
b) WBM roads
c) Both gravel and WBM
d) Flexible pavements

Answer: c
Clarification: The gravel roads and WBM roads are most commonly used unsurfaced roads and they get damaged very easily.

3. The cross slope required for the correction of shoulder is?
a) 2%
b) 3%
c) 4%
d) 5%

Answer: d
Clarification: The cross slope of the shoulder required may be 5%, as they need frequent attention from damage due to rain.

4. The defects like pot holes, corrugation, rutting can be rectified by ___________
a) Trenching
b) Grading
c) Dragging
d) Chemical treatment

Answer: b
Clarification: The grading is an operation that is used to rectify the defects in the initial stage, it is carried out in two stages.

5. The re gravelled course is checked at a distance of every ___________
a) 10 m
b) 20 m
c) 50 m
d) 100 m

Answer: d
Clarification: The gravel course is checked for every 100 m interval by using a camber board.

6. The dust palliative not used for reducing dust is ___________
a) Magnesium chloride
b) Calcium chloride
c) Molasses
d) Fly ash

Answer: d
Clarification: The fly ash is a waste product obtained from the thermal power plant and it is a mineral admixture.

7. The WBM mostly get damaged in ___________
a) Summer
b) Winter
c) Rainy season
d) Spring

Answer: c
Clarification: The WBM mostly get damaged in the rainy season particularly due to steel vehicle drawn by animals.

8. The distress not caused in localised form is ___________
a) Pot hole
b) Isolated crack stress
c) Localised depression
d) Liquefaction

Answer: d
Clarification: The Liquefaction is a phenomenon that occurs in the sand, particularly during monsoon and heavy floods.

9. An existing flexible pavement that develops extensive cracks is called ___________
a) Ravelling
b) Alligator cracks
c) Shear
d) Pot hole

Answer: b
Clarification: The flexible pavement which gets extensive cracks by inter connection of blocks is called alligator cracking.

10. Shear failure are classified into how many types?
a) One
b) Two
c) Three
d) Four

Answer: b
Clarification: Shear failure classified into two types, first one takes place in heavy traffic areas and in second type it is limited to bitumen surface only.