Industrial Engineering and Production Management Online Test – Multiple Choice Questions and Answers 1. The interchangeability can be achieved by better product planning better process planning standardisation bonus plan 2. Process layout is employed where similar jobs are manufactured on similar machines where low volume of production is required where machines are arranged on functional basis all of the above 3. Halsey plan of wage incentive is not applied to all level of workers is based upon efficiency of worker is applied to all level of workers does not guarantee minimum wage 4. Critical path method makes better and detailed planning possible helps in ascertaining time schedules provides a standard method for communicating project plans schedules and to time and cost performance all of the above 5. Travel charts are used to plan material handling procedure and routes analyse material handling determine inventory control difficulties all of the above 6. Which one of the following techniques is used for determining allowances in time study? Work sampling Linear regression Acceptance sampling Performance rating 7. PERT permits management to foresee quickly the impact of variations from the plan provides a way for management to require that planning be done on a uniform and logical basis provides an approach for keeping planning up-to-date all of the above 8. Which of the following wage incentive plan is applied to all workers? Emerson’s efficiency plan Rowan plan Gantt plan Halsey plan 9. CPM requires triple time estimate double time estimate single time estimate none of these 10. For handling materials during manufacture of cement, a __________ is widely used belt conveyor fork lift truck fork lift truck bucket conveyor Loading … Question 1 of 10