300+ TOP Method Study MCQs and Answers Online Quiz

Method Study Multiple Choice Questions

1. Work study consists of

  1. Effective use of plant and equipment
  2. Effective use of human effort
  3. Evaluation of human work
  4. All of the above

2. Work study examines

  1. method
  2. duration of work
  3. both ‘a’ and ‘b’
  4. None of the above

3. Work study is also recognised as

  1. Time study
  2. Motion study
  3. both ‘a’ and ‘b’
  4. None of the above

4. The correct order of procedure in method study is

  1. Select – Record – Examine – Develop – Define – Install – Maintain
  2. Select – Define – Examine – Develop – Record – Install – Maintain
  3. Select – Record – Develop – Examine – Define – Install – Maintain
  4. Select – Record – Examine – Define – Develop – Install – Maintain

5. The following factor(s) must be considered while selecting the work for method study

  1. Economic considerations
  2. Technical considerations
  3. Human reactions
  4. All of the above

6. In process charts, the symbol used for storage is

  1. Circle
  2. Square
  3. Arrow
  4. Triangle

7. In process charts, the symbol used for inspection is

  1. Circle
  2. Square
  3. Arrow
  4. Triangle

8. Delay occurs when

  1. someone stops the process
  2. product wait for next event (operation)
  3. both ‘a’ and ‘b’
  4. None of the above

9. A milk powder tin is being weighed as it is filled is an example of

  1. Operation cum transportation
  2. Operation cum inspection
  3. Transportation cum inspection
  4. None of the above

10. In outline process chart, the horizontal lines represents

  1. general flow of process
  2. materials being introduced
  3. both ‘a’ and ‘b’
  4. None of the above

11. The outline (operation) process chart, the following symbols are used

  1. operation and inspection
  2. operation and transportation
  3. inspection and transportation
  4. operation and storage

12. The following is (are) the type(s) of flow process chart

i. Man type
ii. Material type
iii. Equipment type
iv. The correct answer is

  1. only i
  2. i & ii
  3. ii & iii
  4. All of the above

13. Two hand process chart is commonly used for

  1. repetitive operations
  2. short operations
  3. both ‘a’ and ‘b’
  4. none of the above

14. The following chart(s) record the movements

  1. operation process chart
  2. flow process chart
  3. both ‘a’ and ‘b’
  4. None of the above

15. Which of the following is a scale plan?

  1. String diagram
  2. Flow process chart
  3. Operation process chart
  4. All of the above

16. In THERBLIGS, colour for ‘search’ is

  1. black
  2. grey
  3. red
  4. green

17. In THERBLIGS, ‘→’ symbol is used for

  1. Search
  2. Find
  3. Position
  4. Select

18. In THERBLIGS, Abbreviation used for Disassemble is

  1. D
  2. DE
  3. DA
  4. DS

19. A ____ is based on film analysis

  1. SIMO chart
  2. Flow process chart
  3. String diagram
  4. Operation flow chart

20. In SIMO chart, the movements are recorded against time measured in _____.

  1. Minutes
  2. Seconds
  3. Micro seconds
  4. Winks

21. As per principle of motion economy

  1. Motion of arms should be symmetrical and in opposite direction
  2. both the hand should not remain idle except during rest period
  3. both hands should start and complete their work simultaneously
  4. All of the above

22. The height of chair should be such that the top of work table is ________ the elbow level of the operator.

  1. at same level of
  2. about 30 mm below
  3. about 30 mm above
  4. about 50 mm above

Method Study Objective Questions with Answers Pdf Download