Method Study Multiple Choice Questions
1. Work study consists of
- Effective use of plant and equipment
- Effective use of human effort
- Evaluation of human work
- All of the above
2. Work study examines
- method
- duration of work
- both ‘a’ and ‘b’
- None of the above
3. Work study is also recognised as
- Time study
- Motion study
- both ‘a’ and ‘b’
- None of the above
4. The correct order of procedure in method study is
- Select – Record – Examine – Develop – Define – Install – Maintain
- Select – Define – Examine – Develop – Record – Install – Maintain
- Select – Record – Develop – Examine – Define – Install – Maintain
- Select – Record – Examine – Define – Develop – Install – Maintain
5. The following factor(s) must be considered while selecting the work for method study
- Economic considerations
- Technical considerations
- Human reactions
- All of the above
6. In process charts, the symbol used for storage is
- Circle
- Square
- Arrow
- Triangle
7. In process charts, the symbol used for inspection is
- Circle
- Square
- Arrow
- Triangle
8. Delay occurs when
- someone stops the process
- product wait for next event (operation)
- both ‘a’ and ‘b’
- None of the above
9. A milk powder tin is being weighed as it is filled is an example of
- Operation cum transportation
- Operation cum inspection
- Transportation cum inspection
- None of the above
10. In outline process chart, the horizontal lines represents
- general flow of process
- materials being introduced
- both ‘a’ and ‘b’
- None of the above
11. The outline (operation) process chart, the following symbols are used
- operation and inspection
- operation and transportation
- inspection and transportation
- operation and storage
12. The following is (are) the type(s) of flow process chart
i. Man type
ii. Material type
iii. Equipment type
iv. The correct answer is
- only i
- i & ii
- ii & iii
- All of the above
13. Two hand process chart is commonly used for
- repetitive operations
- short operations
- both ‘a’ and ‘b’
- none of the above
14. The following chart(s) record the movements
- operation process chart
- flow process chart
- both ‘a’ and ‘b’
- None of the above
15. Which of the following is a scale plan?
- String diagram
- Flow process chart
- Operation process chart
- All of the above
16. In THERBLIGS, colour for ‘search’ is
- black
- grey
- red
- green
17. In THERBLIGS, ‘→’ symbol is used for
- Search
- Find
- Position
- Select
18. In THERBLIGS, Abbreviation used for Disassemble is
- D
- DE
- DA
- DS
19. A ____ is based on film analysis
- SIMO chart
- Flow process chart
- String diagram
- Operation flow chart
20. In SIMO chart, the movements are recorded against time measured in _____.
- Minutes
- Seconds
- Micro seconds
- Winks
21. As per principle of motion economy
- Motion of arms should be symmetrical and in opposite direction
- both the hand should not remain idle except during rest period
- both hands should start and complete their work simultaneously
- All of the above
22. The height of chair should be such that the top of work table is ________ the elbow level of the operator.
- at same level of
- about 30 mm below
- about 30 mm above
- about 50 mm above