1. The expected qualities of a product are
A. it satisfies the needs and expectations of the customer

B. It has a pleasing appearance and handles well

C. It has high reliability and functions safely over its intended life

D. all of the mentioned

Answer:
D.all of the mentioned

2. determination of the amount of time required to
A. Method

B. Motion

C. Work

D. Time

Answer:
D.Time

3. The 4Ms does not include .
A. Men

B. Material

C. Message

D. Machinery.

Answer:
C.Message

4. In which type of production system the unit cost of production is low?
A. Combined production

B. Continuous production

C. Intermittent production

D. Custom production

Answer:
B.Continuous production

5. 5. All of the following decisions fall within the scope of operations management except for
A. financial analysis

B. Design of products and processes

C. location of facilities

D. Quality management

Answer:
A.financial analysis

6. may be defined as the ratio between output and input.
A. Production

B. Productivity

C. Batch production

D. Job production.

Answer:
B.Productivity

7. A is something which is offered to customers to satisfy their needs or wants.
A. Process

B. Price

C. Promotion

D. Product

Answer:
D.Product

8. Production is the process by which raw materials and other inputs are converted in to.
A. Finished Product

B. Services

C. Satisfaction

D. Loyalty

Answer:
A.Finished Product

9. The competitive advantage in the production function can be achieved through .
A. A High wastage

B. More cost

C. Higher quality

D. Lowest quantity

Answer:
C.Higher quality

10. Which of the following industries should be located near the vicinity of raw materials?
A. Cycles

B. Televisions

C. Sewing machines

D. Steel mills

Answer:
D.Steel mills

11. If all the processing equipment and machines are arranged according to the sequence of operations of a product the layout is known as
A. Product layout

B. Process layout

C. Fixed position layout

D. Combination layout

Answer:
A.Product layout

12. The following type of layout is preferred to manufacture a standard product in large quantity
A. Product layout

B. Process layout

C. Fixed position layout

D. Combination layout

Answer:
A.Product layout

13. The following type of layout is preferred for low volume production of non standard products
A. Product layout

B. Process layout

C. Fixed position layout

D. Combination layout

Answer:
B.Process layout

14. In ship manufacturing, the type of layout preferred is
A. Product layout

B. Process layout

C. Fixed position layout

D. Combination layout

Answer:
C.Fixed position layout

15. Raw Materials and WIP can be classified under
A. Indirect Material

B. Direct Material

C. Finished Material

D. Standard Parts

Answer:
B.Direct Material

16. The first activity of Purchasing cycle is
A. Communicating requirement to the purchase

B. Source Selection and development

C. Recognizing the need for procurement

D. Inspection of goods

Answer:
C.Recognizing the need for procurement

17. TQM stands for
A. Total Quality Management

B. Total Quantity Management

C. Total Qualitative Management

D. To question management

Answer:
A.Total Quality Management

18. Kaizen is a process, the purpose of which goes beyond simple productivity improvement.
A. weekly

B. daily

C. monthly

D. annual

Answer:
B.daily

19. “Poka-yoke” is the Japanese term for
A. Card

B. Fool proof

C. Continuous improvement

D. Fish bone diagram

Answer:
B.Fool proof

20. Kaizen is a Japanese term meaning
A. continuous improvement

B. Just-in-time (JIT)

C. a fishbone diagram

D. setting standards

Answer:
A.continuous improvement

21. Which of the following is not an inventory?
A. Machines

B. Raw material

C. Finished products

D. Consumable tools

Answer:
A.Machines

22. Which of the following is true for Inventory control?
A. Economic order quantity has minimum total cost

B. Inventory carrying costs increases with quantity per order

C. Ordering cost decreases with lo size

D. All of the above

Answer:
D.All of the above

23. Re-ordering level is calculated as
A. Maximum consumption rate x Maximum re-order

B. Minimum consumption rate x Minimum re-order

C. Maximum consumption rate x Minimum re-order

D. Minimum consumption rate x Maximum re-order

Answer:
A.Maximum consumption rate x Maximum re-order

24. The nerve center or brain of any computer sy
A. CPU

B. Storage device

C. ALU

D. Monitor

Answer:
A.CPU

25. Maintenance consist of the following action(s)
A. Replace of component

B. Repair of component

C. Service of component

D. All of the above

Answer:
D.All of the above

26. The following is (are) scheduled maintenance
A. Overhauling of machine

B. Cleaning of tank

C. Whitewashing of building

D. All of the above

Answer:
D.All of the above

27. The supply chain concept originated in what disci
A. marketing

B. Operation

C. Logistics

D. Production

Answer:
A.marketing

28. A encompasses all activities associated with the flow and transformation of goods from the raw material stage, through to the end user, as well as the associated
A. production line

B. supply chain

C. marketing channel

D. warehouse

Answer:
B.supply chain

29. involves verifying the physical quantities of stores in hand.
A. Pricing of Issues

B. Material control

C. Stock taking

D. None

Answer:
C.Stock taking

30. In ABC analysis the category ‘A’ includes items with small quantity but high .
A. Weight

B. Value

C. density

D. None

Answer:
B.Value