250+ TOP MCQs on Well Completion Design – Concepts and Answers

Petroleum Production Operations Multiple Choice Questions on “Well Completion Design – Concepts”.

It was approved as a second-line treatment in 2000 and a third-line treatment in 2005 for advanced ovarian cancer and lymphatic leukemia, respectively. One thing to remember is that there is a lot https://abliance.com/produits/anticorps-secondaires-polyclonaux/anticorps-secondaires-anti-souris Kryvyi Rih of free and legal love available. The doctor who prescribed misoprostol, told me the price that they were going to provide the medication for me.

Mifepristone and misoprostol price in tanzania - mifepristone - misoprostol. I was miserable and would throw Hastināpur cheap provigil prescription up in the morning for months. Acheter’s website is easy to use and the user does not have to download any files to get the necessary information they require.

1. Pseudo pressure is a pressure function that considers the variable compressibility and viscosity of gas with respect to temperature.
a) True
b) False
Answer: b
Clarification: The statement is incorrect. The correct statement is Pseudo pressure is a mathematical pressure. Pseudo pressure considers the variable compressibility and viscosity of gas with respect to pressure.

2. What is a dog-leg in oil and gas well drilling?
a) Bore hole
b) Place near the perforation
c) Logging data obtained
d) Changing of well trajectory rapidly
Answer: d
Clarification: A dog-leg in oil and gas well drilling means a crooked place where the wellbore trajectory changes rapidly. Sometimes directional drillers intentionally create the dog leg to reach the desired target.

3. The full form of BOP is _____
a) Bottom hole Pressure
b) Bottom Oil Price
c) Below Optimum Pressure
d) Blow Out Preventer
Answer: d
Clarification: The full form of BOP is Blow Out Preventer. An uncontrolled kick (or influx of formation fluid into the well bore) is called a Blow Out. So, to prevent this BOP or arrangement of several valves are attached above the well to seal, control and monitor the well.

4. Which of the following is a Cased hole completion?
a) Casings are run into the zone of interest
b) Casings aren’t run into the zone of interest
c) Casings are not used inside the well
d) Cementing is not done in the well
Answer: a
Clarification: Cased hole completion is a type of completion in which Casings are run in the zone of interest i.e. the reservoir. To initiate the production of oil or gas perforation is to be done through the casing then to the cement and finally to the formation of interest.

5. In general, when a perforation job is to be done then a Casing-Collar- Locator (CCL log) is also run to ensure the correct depth.
a) True
b) False
View Answer

Answer: a
Clarification: Yes, when a perforation job is to be done then a Casing-Collar- Locator (CCL log) is also run to ensure the correct depth. It identifies both the collar location and the packer location.

Leave a Reply

Your email address will not be published. Required fields are marked *