Statistical Quality Control Multiple Choice Questions on “Management Aspects of Quality Improvement – 1”.
1. In the low level of maturity of any organization, the technique of quality improvement that is used the most is _________
a) acceptance sampling
b) statistical process control
c) design of experiments
d) regression analysis
Answer: a
Clarification: In early stage of any organization, the quality knowledge to management is negligible. So acceptance sampling is chosen to get the highest level of it.
2. In the Factorial design type of design of experiments, which of these points are used?
a) Controlling noise factors
b) Outgoing inspection
c) Incoming inspection
d) Testing outputs of all possible combination of factor levels
Answer: d
Clarification: We cannot control noise factors. In factorial design, factors are varied together, in such a way that all possible combination of factor levels is tested.
3. Factorial design is a _______
a) off-line quality control tool
b) on-Line quality control tool
c) in-process procedure
d) redundancy plan
Answer: a
Clarification: Off-line quality control means, quality control before process starts. Factorial design is implemented before process starting, so it is an off-line quality control tool.
4. Control chart is a useful ______
a) manufacturing process
b) process monitoring technique
c) off-line quality control tool
d) part of acceptance sampling techniques
Answer: b
Clarification: Control chart is a very useful part of process monitoring tool, as it can only give information if the process is going out of control.
5. Which of these is not a part of feedback control?
a) Engineering control
b) Automatic control
c) Acceptance sampling
d) Routine adjustment
Answer: c
Clarification: The process variables are adjusted as needed, to get the output process characteristics on target value. This routine adjustment is called Engineering control or feedback control.
6. The highest reduction in the variability from one unit of product to other can be obtained by ______
a) statistical process control
b) acceptance Sampling
c) design of Experiments
d) design of Experiments with automatic control
Answer: d
Clarification: Design of experiments gives the highest reduction in variability. When it is combined with automatic components, the variability reduces even more.
7. Quality assurance is related to _____
a) strategic activities to ensure the financial plans
b) set of activities that ensures that the services and product meet the requirements
c) set of activities that ensures that the supplier-customer quality issues are properly resolved
d) set of activities that include inspection and planning
Answer: c
Clarification: Quality assurance is the set of activities, that ensure the quality levels of products and services are properly maintained, and the supplier-customer relations are good.
8. “We can rely on mass inspection to control quality.”
a) True
b) False
Answer: b
Clarification: Inspection identifies defects at the instant when the producer has already paid to make them. So we cannot rely on mass inspection as it costs much.
9. Which of the following is not based on Deming’s points?
a) Focus on continuous improvement
b) An ongoing program of education of employees is necessary
c) Reach the slogans and numerical goals for the workplace
d) Elimination of numerical quotas and work standards