Estimating and Costing Online Test – Multiple Choice Questions and Answers

1. The assumption on which the trapezoidal formula for volumes is based, is

 
 
 
 

2. The measurement is not made in square metres in case of

 
 
 
 

3. If tensile stress of a steel rod of diameter D is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of the rod is

 
 
 
 

4. The inspection pit or chamber is a manhole provided in a base drainage system

 
 
 
 

5. The most reliable estiamte is

 
 
 
 

6. According to ISI method of measurement, the order of the sequence is

 
 
 
 

7. Cost of fittings and their fixing is specified for the following sanitary fittings

 
 
 
 

8. The expected out turn of 12 mm plastering with cement mortar is

 
 
 
 

9. Pick up the incorrect statement from the following:

 
 
 
 

10. The cross-sections for a highway is taken at

 
 
 
 

Question 1 of 10

12 thoughts on “Estimating and Costing Online Test – Multiple Choice Questions and Answers”

  1. Sir Please send me the question and answer foe all civil engineering subject.

    Best and Regards,

    May Lay

  2. sir plase send me all multiple choice question of wb psc syllabus or previous year question paper

  3. plz send me the answer of this network.

    draw a network and for the project having 9 activities with the following relationship.
    a.) E follow F but preceeds H
    b). E follows D but preceeds J
    c. ) I follows H but preceeds K
    d. ) G follows C but preceeds k
    e. ) F follow C.
    f. ) J amd K are the terminate at the same.
    g.) C and D start the same.