Estimating and Costing Online Test – Multiple Choice Questions and Answers

1. The measurement is not made in square metres in case of

 
 
 
 

2. The inspection pit or chamber is a manhole provided in a base drainage system

 
 
 
 

3. According to ISI method of measurement, the order of the sequence is

 
 
 
 

4. The most reliable estiamte is

 
 
 
 

5. The assumption on which the trapezoidal formula for volumes is based, is

 
 
 
 

6. If tensile stress of a steel rod of diameter D is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of the rod is

 
 
 
 

7. Pick up the incorrect statement from the following:

 
 
 
 

8. The cross-sections for a highway is taken at

 
 
 
 

9. The expected out turn of 12 mm plastering with cement mortar is

 
 
 
 

10. Cost of fittings and their fixing is specified for the following sanitary fittings

 
 
 
 

Question 1 of 10

12 thoughts on “Estimating and Costing Online Test – Multiple Choice Questions and Answers

  1. plz send me the answer of this network.

    draw a network and for the project having 9 activities with the following relationship.
    a.) E follow F but preceeds H
    b). E follows D but preceeds J
    c. ) I follows H but preceeds K
    d. ) G follows C but preceeds k
    e. ) F follow C.
    f. ) J amd K are the terminate at the same.
    g.) C and D start the same.

Leave a Reply to May Lay Cancel reply

Your email address will not be published. Required fields are marked *