This set of Strength of Materials Multiple Choice Questions on “Analyse Propped Cantilever”.
1. In cantilever beams, the extra support is known as ____________
a) Hinch
b) Prop
c) Cripple
d) Indeterminate end
Answer: b
Clarification: In case of cantilever beam, some support other than existing ones may be provided to reduce the amount of bending moment developed. The additional support is known as prop.
2. Prop reduces ___________ in the beam.
a) Deflection
b) Slope
c) Shear
d) Moment
Answer: a
Clarification: The extra support provided in case of cantilever beam excluding the existing ones is known as prop. It is provided in order to avoid excessive deflection caused due to unequal loading.
3. Which of the following is indeterminate structure?
a) Singly rereinforced beam
b) Propped cantilever beam
c) Over hanging beam
d) Simply supported beam
Answer: b
Clarification: The statically indeterminate structures are not capable of being analysed by using equation of statics. We need some more extra conditions for finding unknowns like €i and €y etc. A propped cantilever beam is an example of indeterminate structures.
4. ____________ is used to produce due to temperature variation in indeterminate structures.
a) Stresses
b) Strains
c) Deflections
d) Moment
Answer: a
Clarification: Statically indeterminate structures need some extra conditions for the further simplification. Normally stresses are produced due to variation in indeterminate beams.
5. In cantilever beams, the maximum deflection occurs at ___________
a) Fixed end
b) Free end
c) Through out
d) Point of loading
Answer: b
Clarification: The maximum deflection in cantilever beam occurs at free end. To resist that excessive deflection, the beam has to be supported by an extra support known as prop.
6. As per IRC, maximum width of lane considered as ____________
a) 2.44 m
b) 2.35 m
c) 3.5 m
d) 3.4 m
Answer: a
Clarification: As per IRC, the maximum width be 2.44 m. For a single lane, the width considered is 3.8 m. The pavement having two or more lanes the weight of 3.5 metre per lane is considered sufficient.
7. ______ is the area of land acquired and reserved for future development.
a) Right of pier
b) Carriage way
c) Right of way
d) Camber
Answer: c
Clarification: It is desirable to acquire more land because of the cost of adjoining land in variable increases after laying the road. The right of way is area of land acquired and reserved for future development.
8. Stability of high rise vehicles will be affected due to ____________
a) Camber
b) Gradient
c) Super elevation
d) Formation Width
Answer: a
Clarification: The rise given to the centre portion of the proposed carriageway with reference to its peripheral edge is called camber. Road users use more in the central portion of road and get worn out. The stability of high rise vehicles will be affected due to heavy camber.
9. The longitudinal rise or fall off road surface along its length is _________
a) Camber
b) Super elevation
c) Gradient
d) Carriage way