1. Single stage impulse turbines are also called as?
a) Laval Turbines
b) Lancashire Turbines
c) Cochran Turbines
d) La Del turbines
Answer: a
Clarification: Laval Turbines are single-stage impulse turbines.

2. There are basically ______ Ways of compounding steam turbines.
a) 2
b) 3
c) 4
d) 5
Answer: a
Clarification: There are basically 2 ways of compounding steam turbines namely, Rateau staging & Curtis staging.

3. Rateau staging is another name for?
a) Pressure compounding
b) Velocity compounding
c) Pressure & Velocity compounding
d) None of the mentioned
Answer: a
Clarification: Pressure compounding is also called as Rateau staging.

4. The another name for Velocity compounding is?
a) Rateau Staging
b) Curtis staging
c) Rateau & Curtis staging
d) None of the mentioned
Answer: b
Clarification: The another name for Velocity compounding is Curtis Staging.

5. The Guide vanes remain stationary in?
a) Curtis staging
b) Rateau staging
c) Rateau & Curtis staging
d) None of the mentioned
Answer: a
Clarification: The guide vanes remain stationary in velocity compounding to ensure better operating efficiency.

6. The pressure drop in reaction turbines occurs in?
a) fixed blades
b) movable blades
c) both in nozzles & fixed blades
d) nozzles
Answer: c
Clarification: The pressure drop in reaction turbines occurs in both, the nozzle & in fixed blades.

7. The loss in efficiency from one stage to another is called?
a) Lost efficiency
b) Carry below efficiency
c) Carry-over efficiency
d) None of the mentioned

Answer: c
Clarification: Carry-over efficiency is defined as the loss in efficiency from one stage to another.

8. For straight blades, the minimum blade height is __________ of the mean blade ring diameter.
a) 20%
b) 30%
c) 40%
d) 50%
Answer: a
Clarification: For straight blades, the minimum blade height is 20% of the mean blade ring diameter.

9. Number of parallel exhausts required for a given steam flow rate of x is?
a) x/63.5
b) x/36.5
c) x/68.5
d) x/56.5
Answer: a
Clarification: Number of parallel exhausts required for a given steam flow rate of x is, x/63.5.

10. External loses occur ___________ turbine casing.
a) inside
b) outside
c) inside & outside
d) none of the mentioned
Answer: b
Clarification: External loses are those which occur outside the turbine casing.