300+ TOP Bridge Engineering MCQs and Answers

Bridge Engineering Multiple Choice Questions

1. Bridge can operate on both layers those are

a. physical and the data link layer
b. physical and the sessional layer
c. application and the data link layer
d. physical and presentation layer

2. The bridge must discard any frames too large for its

a. Medium
b. Connection
c. frame format
d. System

3. In transparent bridges, redundancy of the bridges can create loops in the system which is very

a. Desirable
b. Undesirable
c. Rare
d. Easy to unloop

4. Bridges are also repeaters and

a. Regenerator
b. Preprocessor
c. Amplifier
d. All of the above

5. A transparent bridge’s duties include

a. filtering frames
b. forwarding
c. blocking
d. All of them

6. Arrange correct order of component of Bridge from river-bad (1) Abutment (2) Girder (3) Foundation (4) Flooring

a. 3-2-1-4
b. 3-1-4-2
c. 3-4-2-1
d. 3-1-2-4

7. Arrange correct order of component of Bridge from Top (1) Girder (2) Bearing (3) Cables (4) Weep holes

a. 3-2-1-4
b. 3-1-2-4
c. 3-4-2-1
d. 3-1-4-2

8. Arrange correct order of phenomena occur at bridge site from Top (1) HFL (2) Scouring (3) Afflux (4) Natural flow of river

a. 2-1-4-3
b. 2-3-1-4
c. 2-4-1-3
d. 2-4-3-1

9. At bridge site water flows from (1) Cut water to Ease water (2) Ease water to Cut water (3) (1) and (2) both (4) None

a. 1
b. 2
c. 3
d. 4

10. Arrange order of Stages of bridge site investigation (1) Project report stage (2) Reconnaissance or technical feasibility stage (3) Preliminary or techno-economic feasibility stage (4) Detailed survey

a. 2-1-3-4
b. 2-3-4-1
c. 2-4-3-1
d. 3-2-4-1

11. To stabilize the river channel along a certain alignment with certain cross section is known as

a. River network
b. River divert
c. River training
d. None of the above

12. Select incorrect statement : The objectives of river training is (1) To prevent the river from changing its course (2) To prevent from changing its cross section (3) To prevent flooding on surrounding area (4) To provide minimum depth for navigation purpose

a. (1) and (2)
b. (2) and (3)
c. (3) and (4)
d. All the above

13. In river training work for bridge the spur is constructed______________

a. Parallel to river flow
b. Transverse to river flow
c. Inclined to the river flow
d. All the above

14. In river training work for bridge the embankment is constructed______________

a. Parallel to the river flow
b. Transverse to the river flow
c. Inclined to the river flow
d. None of the above

15. In river training work for bridge the vibro-flotation is used when soil is ______________

a. Cohesive
b. Clayey
c. Cohesionless
d. All the above

Bridge Engineering Objective Questions with Answers Pdf Download Quiz

Leave a Reply

Your email address will not be published. Required fields are marked *